Project: The Falls at Riverwood, Logan, UT
Date: December 2010 - May 2011
Problem:
The decks on this project were ready for waterproofing as the snow began to fly. Due to its high elevation, the town of Logan generally gets more snowfall than the surrounding area. With a never ending build-up of snow and ice, a product was needed that could not only be installed in freezing conditions, but would also protect the structure instantly.
Another concern of the builders was the bump from the overlapped weld. They wanted to find a way to hide it.
Duradek Solution:
The Duradek Ultra fully adhered system is capable of being installed year round in just about any weather, including the harsh winter climates found in the Wasatch mountains. Unlike many other products that need several hours or days to cure before the next layer is applied, Duradek is installed in one step and used immediately.
The Duradek applicator was also able to hide the seam by using a router and cutting out a recessed path for the seam to sit, leaving a smooth surface across the deck.
Job Notes:
In January while checking the progress of the completed decks, the weather was below freezing. The current temperature was -6 degrees Fahrenheit.
Applicating Contractor:
492 West 1200 North
Springville, UT 84663
Job Contact:
Wasatch Builders
Ben McBeth - 801.414.4301